Apply now »

Job title:  Test Technician

Job family:  Engineering
Business area:  Hydropower
Contract location: 

Chambly, Quebec, CA

Working location:  Chambly, Quebec, CA
Location type:  Location Flexible
Contract type:  Permanent
Job description: 

As the first equipment manufacturer in Canada and a world leader in the design of hydroelectric turbines and generators, Andritz Hydro Canada has more than 185 years of know-how.

 

In a context of energy transition, our hydroelectric innovation projects make sense. From design to construction, our innovative team of experts offers turnkey solutions. By joining Andritz Hydro Canada, you are contributing to the development of sustainable technology, a clean future, and the maintenance of a proud Canadian's expertise.

 

From water to wire – Be part of the movement!

 

Job description: 
 

The person in charge of this role will be responsible for all testing of equipment manufactured at the Chambly electrical panel assembly plant.

 

The main responsibilities for this key role are as follows:

  • Carry out all checks and tests on manufactured equipment
    • 1 - Assembly verification
    • 2 - Continuity verification (Point to Point)
    • 3 - Dielectric verification
    • 4 - Functional tests
    • 5 - Quality control

 

  • Support engineering teams

Support engineering teams in the following tasks:

    • Test procedure preparation
    • Preparation of test reports

 

  • Promote the health and safety rules in place and ensure that they are complied with.

 

 

Why do you fit the profile?

 

Objectives and desired skills :

  • Be alert to health and safety issues
  • Professionalism
  • Communication skills
  • Integrity
  • Responsibility for actions
  • Respect for deadlines
  • Thoroughness
  • Reading of electrical plans
  • Experience in electrical testing (point-to-point, dielectric, functional testing of control panels)
  • Comfortable with manual work (wiring experience an asset)

 

Schedule :

              8am - 4:30pm Monday to Friday

 

What do we offer

 

  • Life, disability, dental and extended health insurance;
  • Pension plan;
  • Hybrid work mode;
  • Performance share plan;
  • Employee assistance program;
  • Employee individualized training and career plan.

 

 

Did you know?

 

ANDRITZ Hydro Canada is part of an international technology group with an extensive portfolio of sustainable products and solutions. ANDRITZ aims to make the greatest possible contribution to a sustainable future and help its customers achieve their sustainability goals. The group has around 29,800 employees and over 280 locations in more than 40 countries.

 

Andritz Hydro is:

 

  • Over 185 years of experience in turbine design
  • Over 489,000 MW of installed and upgraded capacity
  • Over 33 200 turbine units delivered
  • Over 135 years in electrical engineering
  • 65 representative offices worldwide
  • More than 6100 employees worldwide including more than 600 in Canada
  • Over 50 Compact Hydro units per year
  • A complete range of designs up to 800 MW
  • 20 manufacturing sites worldwide
  • 20% of all turbines in operation worldwide

*Legal status to work in Canada is required.

Requisition ID:  14766

Apply now »